The two steels protruding out the roof are installed to support the rear dormer and the front "Ashlar" supporting wall Internal view of the steel used to support the new floor joists The top ridge beam is extended out over the existing roof 
The roof is stripped off so that the new gable end can be extended out to it's new position The front of the roof is stripped off ready to be extended out to the new gable wall The rear dormer is constructed ready for cladding with plywood
The internal walls are constructed to form the bedroom, hallway and en-suite then insulated and plaster boarded After completion of plastering the new fitted oak wardrobe doors are installed The en-suite is now tiled ready for fitting of all sanitary ware
The gable end is tiled on this occasion but is also sometimes rendered

 

 

 

 

 

 

 

 

 

 