| The two steels protruding
out the roof are installed to support the rear dormer and the
front "Ashlar" supporting wall |
Internal view of the steel
used to support the new floor joists |
The top ridge beam is
extended out over the existing roof |
 |
 |
 |
| The roof is stripped off
so that the new gable end can be extended out to it's new position |
The front of the roof is
stripped off ready to be extended out to the new gable wall |
The rear dormer is
constructed ready for cladding with plywood |
 |
 |
 |
| The internal walls are
constructed to form the bedroom, hallway and en-suite then
insulated and plaster boarded |
After completion of
plastering the new fitted oak wardrobe doors are installed |
The en-suite is now tiled
ready for fitting of all sanitary ware |
 |
|
|
| The gable end is tiled on
this occasion but is also sometimes rendered |
|
|