1st day view of the inside of the loft The external roof prior to fitting of any Velux windows Initial roof timbers are installed so that the new Velux windows can also be installed to allow some natural light into the loft
The dormer is constructed and the existing roof can be seen where is extends into the dormer - this shall be removed Both dormers are now constructed and shall have both roofs felted tomorrow then followed by the tiling to the sides View from inside the dormer you can see the two wide openings that shall form the double French doors with Juliet balcony
The inside of the larger dormer with all steelwork and new timbers in place now allows all existing old timbers to be removed Internal view of the larger dormer with opening for the single French door The dressing room has now been plaster boarded ready for the fitted wardrobes
The larger room is now plaster boarded ready for plastering. The original window is uncovered and used as a feature within the loft The larger room has now been plastered. Oak skirting and flooring is now installed View from inside the larger room looking out through the new oak French doors
Opposite end of the larger loft room  View from the office room looking out through the French doors and Juliet balcony Both pairs of French doors in the smaller loft with two rooms
Looking across the back of the dormers once all three Juliet balconies have been installed The Staircase into the larger loft conversion complements the existing staircase The second staircase into the smaller loft with two rooms. A shoe rack was created in pine timber together with a solid oak pull out gang plank
The dressing room is now fitted out with fitted wardrobes and draws Rear view of the completed rear dormers complete with Oak French doors and Juliet balconies

 

 

 

 

 

 

 

 

 

 