| The existing roof shape is
"hipped" in on the side |
The new "Gable
end" is now starting to be constructed over the existing roof |
The structure of the gable
end is now formed together with the rear dormer sides |
 |
 |
 |
| 8:00am: The first timbers
for the rear dormer are now in place at the start of "dormer
day!" |
11:30am: The studwork
shell of the new dormer is complete |
4:00pm The exterior of the
dormer is now covered and ready for the external roof works to
start |
 |
 |
 |
| The gable end is prepared
with metal lathe ready to be rendered with sand & cement |
The windows are fitted and
the tiling is now complete |
The bathroom is fitted
with initial 1st fix plumbing requirements ready for tiling |
 |
 |
 |
| The conversion has now
been plastered and the doors are fitted |
View inside the rear
bedroom |
The bathroom is now tiled
and all sanitary ware is fitted |
 |
 |
|
| View inside the bathroom |
View from the top landing
down to the ground floor |
|