The existing roof shape is "hipped" in on the side The new "Gable end" is now starting to be constructed over the existing roof The structure of the gable end is now formed together with the rear dormer sides
8:00am: The first timbers for the rear dormer are now in place at the start of "dormer day!" 11:30am: The studwork shell of the new dormer is complete 4:00pm The exterior of the dormer is now covered and ready for the external roof works to start
The gable end is prepared with metal lathe ready to be rendered with sand & cement The windows are fitted and the tiling is now complete The bathroom is fitted with initial 1st fix plumbing requirements ready for tiling
The conversion has now been plastered and the doors are fitted View inside the rear bedroom The bathroom is now tiled and all sanitary ware is fitted
View inside the bathroom View from the top landing down to the ground floor

 

 

 

 

 

 

 

 

 

 