| The existing loft with
high pitched roof |
The new floor joists are
installed and packed up above the existing ceiling |
The front "Ashlar"
support wall is constructed on top of the front steel to support
the front roof |
 |
 |
 |
| The "hipped"
side of the bungalow shall be converted to a gable end. The new
support for the flat roof is in place |
The rear roof is stripped
off and the front part of the gable end has been constructed |
You can clearly see the
old darker timbers that previously formed the hipped side to the
loft and also the new timbers that now extend the size |
 |
 |
 |
| The rear wall is now
constructed and the new roof timbers are installed. The timber
cladding to the roof and dormer sides will also be installed today
together with the felt |
Once the outside roof work
is complete the inside is then insulated, plaster boarded and then
plastered. The skirting, architrave and doors are also fitted |
The en-suite is now tiled
and fitted with a wall hung toilet and hand basin complete with
hidden cistern |
 |
 |
 |
| View of the bedroom |
View of the bedroom and
door to hallway with full height designer radiator |
The French doors and Juliet
balcony are now fitted |
 |
 |
|
| Rear view of the new
dormer after completion of the roofwork |
Front view of the loft
conversion with the 3 Velux windows |
|