 |
 |
 |
| The loft can be seen here
with the existing roof trusses in place |
The new steels have been
installed together with the new floor joists. The existing roof
trusses have now been removed |
The complete loft is now
insulated and any internal walls are installed into place |
 |
 |
 |
| This is some framework for
a fitted bookshelf... |
The framework is then
insulated and plaster boarded... |
And now the bookcase is
plastered |
 |
 |
 |
| Pine shelving is installed
once painted to complete the fitted bookshelf |
The new staircase blends
in seamlessly with the existing stile of the house |
View from the new landing
looking down over the new staircase |
 |
 |
 |
| External view of the
"Velux Cabrio" double balcony window. As you can see
both top windows extend upwards and one lower window opens out as
a balcony. The second lower window does not open |
Internal view of the
"Velux Cabrio" double balcony |
View from the music/study
area at the top landing and looking through into the main room
with the en-suite door in the distance |
 |
 |
 |
| En-suite toilet is now
fitted together with larger mosaic tiling |
The wash hand basin is
also fitted |
View from the en-suite
area looking through the main bedroom and into the landing area
and music/study area |
 |
|
|
| External view of the loft
conversion prior to the start of the loft conversion |
|
|