The loft can be seen here with the existing roof trusses in place The new steels have been installed together with the new floor joists. The existing roof trusses have now been removed The complete loft is now insulated and any internal walls are installed into place
This is some framework for a fitted bookshelf... The framework is then insulated and plaster boarded... And now the bookcase is plastered
Pine shelving is installed once painted to complete the fitted bookshelf The new staircase blends in seamlessly with the existing stile of the house View from the new landing looking down over the new staircase
External view of the "Velux Cabrio" double balcony window. As you can see both top windows extend upwards and one lower window opens out as a balcony. The second lower window does not open Internal view of the "Velux Cabrio" double balcony View from the music/study area at the top landing and looking through into the main room with the en-suite door in the distance
En-suite toilet is now fitted together with larger mosaic tiling The wash hand basin is also fitted View from the en-suite area looking through the main bedroom and into the landing area and music/study area
External view of the loft conversion prior to the start of the loft conversion

 

 

 

 

 

 

 

 

 

 

Copyright © 2012 elite lofts All rights reserved