Floor joists laid down in the first week and trimmed out for staircase

 

Roof timbers are trimmed out ready for the new Velux roof windows Start of second week - the rear roof is stripped off in preparation for the building of the dormer 
The rear wall is constructed and a few ceiling joists have also been installed

 

The dormer construction is near completed and the flat felt roof is being installed The staircase has just been fitted
The two Velux windows to the main bedroom are installed

 

The loft is now insulated and ready for plaster boarding The plaster board is now being installed
The loft has now been plastered so the spindles and hand-rail are now installed too

 

The staircase has now been painted The main bedroom Velux windows provide excellent light to the bedroom
View looking up the new staircase with the small velux window above providing natural light into the staircase

 

The en-suite has been tiled by elite lofts too and the plumber has fitted the toilet and hand basin The shower has also been tiled
The completed bedroom!

 

 

 

 