The staircase has just been fitted so the surrounding studwork walls are now built up to the staircase

 

The conversion has now been insulated and plastered. The new laminate floor is being laid before any skirting boards or architraves are fitted. The newly formed hallway has now also been plastered and the hand-rails fitted.
Another view of the bottom of the staircase.

 

The finished smaller green room for the baby... Looking at the entrance door from the stairs
Another view of the smaller green room

 

The Main larger pink bedroom and play area External view from the front with the two Velux windows installed
External view from the rear of the property. The two Velux windows can be seen, there is also a third on the left hand side of the roof (out of view)

 

 

 

 

 

 

 

 

 

 