Before the conversion starts you can see how space is limited within the loft. The floor joists have been constructed and the start of the dormer construction is prepared The dormer is erected and is now ready to be clad with plywood and felted over for the night to keep the roof water-tight. The felt roof is then put on the following day and the external tiling is also started

 

The Velux windows to the front of the bungalow are installed and insulation begins

 

The cheeks and roof of the dormer are also insulated Another view of the velux windows and insulation
The whole conversion is now plaster boarded and then time for a big tidy up ready for the plasterers The loft has now been plastered  and is ready for all skirting and architraves to be installed.The open plan staircase really makes this room look big, and the large windows provide great natural light.

 

The triangular windows on the gable end of the bungalow also lighten up the room and provide a great view
The external roof work to the dormer is complete along with all fascias, soffits and drain pipes to blend in with the existing ones.

 

View of the gable end with the new triangular windows. The stairs have now been lacquered with a natural finish
The bedroom has been carpeted and fully decorated in neutral colours. View of the toilet once tiling has been complete The hand-basin with mirror over head

 

 

 

 

 

 

 

 

 

 